Hi Akshaya: Thanks for your detailed answer. You have guessed correctly that I want to run the model for 2 days, however only for hydraulics and not for water quality. What I want to see is the percent full curve of the tanks for 48 hrs (which will be replication of curve for 24 hrs). As I have mentioned in my query I have successfully applied all the controls for 24 hrs. Now, say if for one valve there is control for 16 hrs in 24 hrs run, should I have to repeat the same control once again with extended time as per 48 hrs. format for next 48 hrs run. OR is there any in built function in WaterGEMS by just selecting that model will take all the controls for 24 hrs (which are not going to change for any no. of days of runs) and show the results for 48 hrs. About demand pattern you already replied in above email that if I don't have data for 48 hrs then model will by default repeat the 24 hrs pattern (in my case my demand pattern for 24 hrs is fixed and I just want to repeat it once again for 48 hrs run which model will do by default). Same thing should be possible for valve and pump controls. This is what I mean best (or efficient) way. Thanks again.
↧