Quantcast
Channel: OpenFlows | Water Infrastructure
Viewing all articles
Browse latest Browse all 39611

Forum Post: Fixing Chainage for manholes

$
0
0
Hello Everyone, I would like to know if there is a possibility of fixing chainages of our own choice for the starting manholes so that when we prepare L-section in SewerGEMS, the chainages get reflected on the x axis. At present SewerGEMS assigns 0+00 chainage (station) to first manhole of the L-section. I would like to fix the chainage of all starting manholes and let SewerGEMS calculate chainages of all downstream manholes. The requirement is that the same should also get reflected in the L-section output from SewerGEMS. This will save some effort while preparing the drawings. Best Regards Jatin Talwar

Viewing all articles
Browse latest Browse all 39611

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>