Quantcast
Channel: OpenFlows | Water Infrastructure
Viewing all articles
Browse latest Browse all 39611

Wiki Page: The ponds in my interconnected ponds (ICPM) model are not at expected levels at the end of the simulation

$
0
0
Applies To Product(s): Bentley PondPack Version(s): 08.11.01.56 Environment: N/A Area: Modeling Subarea: Original Author: Mark Pachlhofer, Bentley Technical Support Group               Problem Description I have an ICPM model where I expect all the pond elevations to be within about 0.5 feet of each other at the end of the simulation, but the results I'm getting are not showing that. What can I do to fix my model? Steps to Resolve 1)  For all your ponds that are interconnected check to make sure they only have one pond outlet entrance and one outfall set to a boundary condition type of "boundary element" connected to them. The following is a valid pond routing configuration:   The following is  NOT a valid configuration:   This is also  NOT a valid configuration:   2)  Check to make sure all your outlet structure elevation are correct and the correct ponds are assigned as the upstream and downstream ponds if you are using the headwater/tailwater type of "Use Pond for Headwater (Tailwater) Range" 3) This information about troubleshooting a mass balance user notification will also help.  

Viewing all articles
Browse latest Browse all 39611


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>