Scott, In the Darwin Calibrator, it seems that flows are added as a demand - not by opening hydrants. When I was analyzing prior to the Darwin Calibrator analysis, I had a steady state analysis with EPS Snapshot with (a) open hydrant(s). Not having similar flows were also part of calibration analysis when I use this method. Here is my question. Adding a hydrant flow as a demand vs. opening hydrants Are both good methods for calibration? If the hydrants do not produce as high flow as in the field, can I simply add the flows as demand? Yoko
↧